Place the drip.
Roof edge detail with wood siding.
Residential and commercial roofing shingles slate roof ventilation roof underlayments asphaltic and tpo roof membranes.
Roof pitch the metal roofing panels shown in this manual require a mini.
Gibraltar building products 2 in.
Struction details illustrated in this manual depict wood nailers and blocking at roof edges and other points of roof termination.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
Drip edge is metal border put along the edges of a roof to keep water from getting up under the shingles and down into the facing board fascia roof decking and rafters or trusses.
Never caulk the joint between the siding and the head casing or the sill leaving these joints open to drain any trapped water.
Also see windows doors.
At the gable edge use a gable or sidewall flashing.
Click to enlarge any image.
Siding details at roof wall joint step flashings to avoid rot.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
Install drip edges on the eaves first.
9 3 built up roofing because this is a wood detailing manual this section will only attempt to highlight some basic edge conditions that often adversely affect adjacent wood construction.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Stop wood sidings at least 1 inch short of the bottom leg at step flashings and other roof flashings.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
Aluminum flashing aluminum drip edge style d drip edge flashing drip edge drip edge flashing abc siding gutter corner shield.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
It comes in varying widths bent at a 90 degree angle so one face goes on the roof and the other side goes down the facing.
This especially is true at parapet walls and copings and roof edges where edge metal shapes are fastened to wood blocking.
The following conceptual details figures 9 1 to 9 6 show some of the typical conditions commonly encountered.
This will keep weather out prevent lifting in high winds and provide a neat fin ished appearance.
Do not step on panel ribs or on trim pieces to prevent kinking.
Galvanized steel drip edge flashing in weathered wood model 08316 7.
At the gable edge use a gable or sidewall flashing.
Explore more on.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Our photo illustrates several details of roof drip edge.