Lay out the courses on the wall using a chalk line to establish level reference lines.
Shake siding chalk line.
Up from the bottom edge of the starter strip.
Step 1 measure your shingle line.
Lap siding for the starter course.
If you do overdrive a fastener seal the hole and exposed substrate with an astm c920 class 25 sealant.
Installing vinyl shake siding.
Before you can start mounting your cedar shake siding you will need to mark out your rows so that they don t slowly arch up or down as they are being secured.
Nail the starter strip to the siding.
Snap a chalk line 1 starter strip make sure to meet clearances at roof line and or horizontal trim first shingle goes on far left chalk line second row begins at center chalk line use left over and new.
If a nail is overdriven by more than 1 8 seal the hole and renail it.
Position the panels so that the joint lines are staggered.
This will make more sense as it is seen on the actual wall when mounting the cedar shake siding.
Pop a level chalk line for the starter strip an inch or two above the bottom of the siding.
Cedar shake siding installs best on a solid base such as the existing wood siding or a plywood shear wall ideally 7 16 or better.
3 snap a level chalk line 81 4 in.
Installing vinyl shake siding.
Try to avoid overdriving the nails.
Start in bottom left of your outside wall and measure half of your shingles length from the base of your wall that will be getting the new siding.
Always set your nail gun so the head of the nail is snug against the siding or flush with the siding surface.
Step 5 repeat the process.
Often times this is used to develop a reference line as to which the starter strip can be installed.
Vinyl shake siding is low maintenance durable and resembles real wood shakes.
A chalk line is a good way to start an installation.
Align the thick lower edge of a cedar shake at the lower edge of the siding or shear wall.
For wainscot snap a chalk line on the wall from end to end at the desired height of the wainscot.
2 use hardieplank 81 4 in.
4 position the top of the starter course along the chalk line use a straight edge on bottom of shingles if uniform straight edge is desired 5 the first course of shingle siding is then.
We recommend measuring equal distances down from the eave line or from the window sills that are at the same height figure 9 3.
13 make sure to sure siding nails on the small pieces on the edges do not use a trim nail to install find center of gable.
Nail the starter strip to the siding aligning the top of the strip with the chalk line.
Installation isn t that difficult if you follow these steps.
Installing cedar shake.
Nail vertical vinyl corners to the corners of the house making sure they are plumb.