Substructures should be designed to meet all necessary code requirements.
Should i get panel loc plus roof ibstslled.
Panels should be installed in the sequence indicated 1 2 3 and so on.
The minimum roof slope for the 5 8 panel loc is 3 12.
Install the panel so that the short lip overlaps the large lip.
Panel loc plus is available in 29ga and 26ga painted galvalume bare galvanized.
Panel loc plus with the central guard paint system powered by valspar s weatherx technology gives agricultural projects light commercial projects and residential roofs the protection of steel with a timeless attractive appearance of a 40 year limited paint warranty.
Roofing panel loc and panel loc plus are not recommended on roof pitches less than 3 12.
The minimum pitch along with panel loc s siphon groove will allow for sufficient drainage of water.
The silicone will spread and adhere creating a seal.
Available in 12 16 and 18 widths tite loc and tite loc plus panels can be.
The panels have been designed for application over a wide variety of substrates on roof slopes as low as 1 2 12 pitch.
It is the responsibility of the contractor to ensure a suitable substrate prior to the application of panel loc plus.
When splicing panels for longer lengths overlap panels 6.
Metal roofing is also available in the form of.
Tite loc and tite loc plus panels are factory formed to length and field seamed to a 90 lock tite loc or a 180 lock tite loc plus.
When installing panels against forceful wind the first sheet should be installed along the eave farthest away from the direction of the wind.
Panel loc plus panel loc plus is a low rib 3 4 panel which provides durable performance with an added striation on top of the rib that gives it even more strength.
Maximum purlin spacing for roof 5 on center option 1.
P anel loc plus is a low rib 3 4 inch panel available in 26 and 29 gauge that provides lasting durable performance.
You may need to cut panels to fit angles using a circular saw with a metal saw blade.
Roof preparation panel loc plus can be installed over existing shingles over solid decking or over purlins open framing.
Panel loc plus gives agricultural and light commercial projects as well as residential roofs the protection of steel with an attractive appearance.
Treatment eliminates fingerprinting and foot marking during installation.
Continue adding panels until the roof is covered.
Side laps should face away from wind see.
Panel loc plus is a low rib 3 4 panel which provides durable performance with an added striation on top of the rib that gives it even more strength.
That is the side furthest from the direction of the prevailing winds see illustration.